UPS Room
Client:
Project Details:
Formation of a new UPS Room, Battery Room and Site Storage Areas in the basement of a large network site in Central London. Works included the strip out and removal of old stores, general waste and lockers. Take up old parquet flooring area ready to receive new screed buildup. Dry lined partitions built in and around live services with a fire stopped section at high level to form required room integrity. Installation of new raised access flooring, ramps and access, floor paint and decorations throughout along with installation of new doors.
The site was kept live throughout the construction process requiring detailed planning stage and on site segregation with safe routes along key to delivering the project.
Works Included:
Do you have any questions?
Just call us on 01268 561516 or EMAIL US and we’ll be glad to help with your enquiry