Commercial Unit Rainham

Client: Confidential
Works: Construction of New Industrial Units
Duration: 11 weeks

Project Details:

 

After a competitive tender process Mountfield were selected to carry out the construction as Principal Contractor of 2 new Commercial Units in Rainham, East London.

Our works included carrying out a site clear prior to installation of piling and associated drain and groundworks. Steelwork frame and cladding install with security doors and roller shutters. A power floated concrete slab internally along with services and toilet block.

Project carried out over an 11 week period on site.

Works Included:

  • Groundworks
  • Piling
  • Brick and Blockwork
  • Steel frame
  • Cladding
  • Rainwater and below ground drainage
  • All new Doors

Do you have any questions?

Just call us on 01268 561516 or EMAIL US and we’ll be glad to help with your enquiry